top of page
Search

MasTec shop

christianwicks91

At King Controls Electrical, our team wired this building from the ground works, all the way to the very last plug. This shop consists of a beautiful lobby, several offices, 2 kitchens, and a 4 bay shop including 1 wash bay.

My responsibilities included:

- Install all underground pipes and cables including main service conductors

- Run EMT, PVC, TECK, spiral duct, iron gas pipes and high pressure water pipes

- Wire pulling, labeling, and terminating

- Mount, wire, and test main service, lighting and plugs, HVAC air system, co2 detectors, and bay door openers

- Inspect and operate scissor and boom lifts - Interpret blueprints

- Perform daily safety meetings


 
 
 

Comments


bottom of page